Recent Projects
IOT prototype snowfall sensors for major distributor
Customer required automated snowfall measurements to be acquired within extremely low-temperature outdoor environments (-40C). No off-the-shelf solutions existed for this application.
Thermal vision inspection system
An existing electromechanical automotive test system required specialized thermal vision integration and communication software upgrades.
Thermal chamber performance tester
Commercial grade thermal insulation testing was required for production batches of customer containers (100% Inspection). Designed & developed system capable of testing seven units simultaneously.
High voltage coolant heater inspection
An automotive manufacturer required a quality inspection end-of-line tester for their high-voltage coolant heater production assembly line.
R&D thermal chamber performance tester
Manual R&D testing of thermal chambers resulted in significant post-processing of data, the potential for inconsistency in data or test setup, and required waiting several days for performance results.
Machine utility measurement system
A non-invasive solution for capturing compressed airflow and cooling water flow into large machinery to validate adequate supply at final location.
SIPA machine data acquisition & analytics software
Large-scale process optimization was required on a SIPA extrusion blow molding production line.
In-line bottle wall thickness measurement system
End Customer would no longer accept product (bottles) unless 100% inspection was performed on every bottle at critical wall thickness locations.
Military automated frequency sweep program
Frequency sweep testing of military-grade bunkers required 2 weeks of manual testing. Novum reduced this to 2 days with automation.
Commercial clutch fan production testing
30 Year old control system was becoming unreliable and costly to maintain. Novum fully upgraded electrical enclosures & custom LabVIEW software.
Automated consumer PC power testing software
Tier 1 PC Manufacturer’s obsolete test software was unreliable & causing severe downtime. New client-server PC power testing software was required.